Abstract:
This research was to reduce the wasted the Chaingard Powder production line. The problem was that the filling position had the most working time, the result was that it was effected in the other positions for being waited and wasted time from punching boxes / preparing bottles in the fill position by using the ECRS principle, The simplified method was to create a vial box to eliminate the uncut / bottle preparation of processing. Therefore, a trial box was created to collect the timing of working data. Performance was wasted timing can be reduced by CG.Powder 24x100G products. Originally, the production time was 1.22 minutes per box and it was reduced to 0.95 minutes per box, This resulted in an increase of production capacity by 14 boxes per minute, accounting for 28.57 percent. Previously, production time was 1.19 minutes per box, then reduced to 0.80 minutes per box, increasing production capacity by 24 boxes per minute, accounting for 47.05 percent.