Abstract:
This research was done to study the design of wastewater treatment system fordyeing factory by using Cyclic Activated Sludge System (CASS). The study was concerned withthe cycle treatment of combined wastewater fiom production line and dormitory wastewater formaximum efficiency and lowest cost.Since the BOD5/COD ratio of wastewater is 0.37, therefor it could be treated bybiological treatment and reaction rate constant was 0.08, ultimate load BOD was 474.78 mg/lwere used to calculate the CASS system. From CASS design, the BOD load of water treatmentsystem was 0.15 kg/m3 , flow rate was 3,000 m3 /d , F/M Ratio was 0.06 and volume of CASS was6,000 m3 . The result wastewater analysis showed that the nutrients were sufficient due to theinfluent fiom dormitory wastewater.From the result of study the optimum aeration time, it was found that the treatmentwith the fill-aerated time, fill- settle time and decanting time of 6: 4: 2 by hours and flow ratewas 3,000 m3/d gives the highest efficiency with dissolved oxygen in the range of 0.26-2.67mg/l and lowest electrical cost. It was able to reduce BOD, COD, TKN and PO43- 98.56%,78.00%, 95.44% and 81.05% respectively and the electrical consumption is lower than the other two systems.