Abstract:
This research aims to study the Problems and parcel of the development administration district in Amphoe Mueang Phayao, Phayao Province. Efficient management package to improve accuracy and efficiency. Conducted a survey of municipal mayor, deputy director chief procurement officer employees in the district, Muang District 9 at 10 by means of convenience sampling. The result was a total of 90 people had results below. Administrative Problems parcel of the municipal district in Muang Phayao Phayao found that the average overall the moderate middle, with a mean of 3.02 was classified according to the problem that I have with most problems is the distributor. A mean of 3.13, followed by moderate levels of maintenance. A mean of 3.03 at a moderate level. The procurement. The mean was 2.98 and the distribution and inventory control. A mean of 2.93 in the medium, respectively. Significance level of a parcel of district administration in Amphoe Mueang Phayao Phayao Municipality deputy mayor, who was Director of the Chief Procurement Officer hired employees in the district, Muang District. A parcel of district administration in Amphoe Mueang Phayao Phayao province is different, and on analysis found that the procurement. The distribution and inventory control. Maintenance. The distribution.A parcel of district administration in Amphoe Mueang Phayao Phayao different. Guidelines for Management Development category correctly and efficiently. Should be controlled from within the particular procurement. Must control both people and systems or procedures to measure the work performed. Supplies and equipment for the control of the defense is to keep them from buying more than necessary. And maintain the supplies and equipment lost or damaged or deteriorated faster than expected. The division of labor. Responsibilities strictly separate. To prevent a single individual controls all work. This will cause corruption. Difficult to detect. Administrators can not know until the new staff. The system performance. Authorities in order to comply with the same. Will be no arguments later systems work rules or procedures are required to be placed within the same checking process always. Check the error between them. And prevent fraud more difficult. Provide a report to know the movement and can measure it periodically."